[1]孙立. 市域铁路轨道结构形式及主要结构设计参数探讨[J]. 铁道工程学报,2014(1):15-19.
Sun Li. Exploration on the Track Structure Type Selection and Key Design Parameters of City Regional Railway [J]. Journal of Railway Engineering Society, 2014(1):15-19.
[2]张学斌,彭朋. 市域铁路速度目标值研究[J]. 铁道标准设计, 2014(3):10-14.
Zhang Xuebin, Peng Peng. Research on Speed Target Value of Urban Regional Railway [J].Railway Standard Design, 2014(3):10-14.
[3]王伟立. 市域铁路与国铁互联互通的技术条件研究[J]. 铁道工程学报,2013(6):92-96.
Wang Weili. Analysis of Technical Condition of Interconnection of Interoperability between City Regional Railway and National Railway [J]. Journal of Railway Engineering Society, 2013(6):92-96.
[4]胡仁兵. 市域铁路制式选择分析[J]. 铁道工程学报, 2014(6):99-103.
Hu Renbing. Analysis of Urban-suburban Railway Standard Selection[J]. Journal of Railway Engineering Society, 2014(6):99-103.
[5]李玲. 市域铁路运营评价研究[D]. 成都:西南交通大学, 2014.
Li Ling. Research on Assessment of Regional Urban Railway Operation [D]. Chengdu:Southwest Jiaotong University,2014.
[6]喻文球. 温州市域铁路网系统制式研究[J]. 铁道工程学报,2014(3):14-18.
Yu Wenqiu. Research on Format of Urban Rail Transit Net Work System in Wenzhou[J]. Journal of Railway Engineering Society, 2014(3):14-18.
[7]唐丽. 长沙地铁正线用60 kg/m钢轨9号单开道岔(整体道床)的设计[J]. 铁道建筑技术, 2012(10):6-9.
Tang Li. The Design of No.9 Simple Turnout(Monolithic Bed) with 60 kg/m Rail for Changsha Metro Main Line[J]. Railway Construction Technology, 2012(10):6-9.
[8]刘皓,袁宝军. 直向通过速度为200 km/h的60 kg/m钢轨12号道岔的研制[J]. 铁道建筑, 2006(6):72-73.
Liu Hao, Yuan Baojun. The Development of Straight Through Speed 200 km/h 60 kg/m No.12 Turnout[J]. Railway Engineering, 2006(6):72-73. |