Abstract:Research purposes: In recent years,the tunnel in China gradually trends to the long one with large section and deep burying.But now the tunnel development is restrained by the geological disasters.This paper mainly discusses the effective measure for control of geological disasters to reduce the impact of the complex geological conditions on tunnel construction.
Research conclusions: In today of the continuous development of tunnel,how to effectively control geological disasters in tunnel construction is the key element for ensuring the normal service of the tunnel.According to the influence factors on the tunnel construction,this paper discusses the measures for control of geological disasters in tunnel construction and points out the control of the geological disasters in tunnel construction is complex engineering and it needs the coordinations among the authorities concerned.The methods of TSP and high density resistivity are the effective ways to control the geological disasters.If the warning forecast is used,combining long—term forecast with short—term forecast,combining the control of the disaster on the upper part with the control of the disaster on lower part and combining the quantitative control with qualitative control are needed to guarantee the the forecast accuracy.In addition,it is necessary to strengthen the works of the blast control,informationalization construction and applications of new technologies and methods.
郭维君,陈学军,肖桂元. 长大隧道施工开挖地质灾害控制研究[J]. 铁道工程学报, 2010, 27(9): 41-45.
GUO Wei—jun,CHEN Xue-jun,XIAO Gui—yuan. Research on Control of Geological Disaster for Excavation of Long Tunnel. 铁道工程学报, 2010, 27(9): 41-45.
Li Zhihou,Chen Shuwang, LeiHua. Investigate Tunnel Dynamic Feedback Design and Information Construction of the Basic Conditions [C ] //2008 National Tunnel Monitoring and Back Analysis Symposium Technology, 2008.
Zhang Xiqian, Zhou Jing, Zhang L.i Comprehensive Description of New Technology of Underground Construction in Our country [J ]. Construction, 2006 (7) : 10 -14.
Liu Zhong, Liu Jianguo, Zhang Yi. New Technology of Tunnel Full Range of High -pressure Jet Grouting Shed Advance Support [ J ]. Rock Mechanics and Engineering, 2009(1): 59 -65.