Abstract:Research purposes: In the process of railway construction,management is the key ele4ment of the project management by proprietor.Whether the construction safety,construction quality,construction schedule,environment protection and technological innovation can be ensured or not mostly depends on the quality of engineering design.Taking construction of Yichang—Wanzhou Railway as an example,this paper analyzes the problems in design WoI'ks and causes for them from the perspective of proprietorg design management and puts forward recommendations.
Research conclusions:(1)The proprietor must play the core and leading role in the design management.(2)The design unit should bear all the responsibility for the design quality.(3)The major technical programs should be accredited by professional team.(4)For the total price contract,more attention should be paid to ensuring the construction security and quality in the engineering design and for the unit price contract,attention should be paid to examining the design.(5)It is necessary to study more appropriate field coordinated system of design corporation.(6)Implementation of the”Design Supervision”system is the inevitable trend of social and economic development.
刘伟. 铁路建设项目业主方设计管理工作的思考[J]. 铁道工程学报, 2010, 27(9): 98-101.
LIU Wei. Thoughts on Design Management of Railway Construction Project by Proprietor. 铁道工程学报, 2010, 27(9): 98-101.
Sun Liang, Li Wenbin, An Zhen. Study on the Organization ' s Frame work of Design Management Conducted by the Large Construction Clients [ J ]. Construction Economy, 2009(Supplement): 66 -68.
Wang Aiguo, Zhang Heming. Exploration and Innovation Practice in Proprietor 's Design Management of Construction Project. [ J ]. Project Management Technology, 2009(7): 33 -38.
Sun Canglong, eta.l Understanding and Thinking on Construction on Whole Process Design Management in Construction Project [ J ]. Architectural Design Management, 2009(1): 19 -21.