Abstract:Research purposes: It reaches a peak-hour on metro construction in our country and a metro construction project is complex, especially management of project progress is very difficult. Schedule delay due to progress management is in a high proportion in the view of experience past and the improvement of level on management efficiency and quality is a key and difficult point in project management of metro construction. Based on the focus of difficulty on metro construction management, this paper neatens the organization structure and flow of metro design management, researches the method to improve the level of metro design management in the way of informatization, and develops the management system of metro design based on framework PIP. Finally, this paper has an empirical study based on the line 3 and line 4 of Wuhan metro.
Research conclusions: (1) From the analysis and the test run it is concluded: The Metro Group Co. Ltd. Can intervene to manage in time due to the timely issue and transmission of design progress information in the test run, and the great majority delay have not affected the construction on site, and the proportion of construction progress delay due to design has reduced to 15%. (2)The function of design change has not achieved yet due to the lack of standardization of the workflow of all participant. The information technology can't solve any management problem and the premise of the success of management system application based on PIP framework is the normative plow and a higher level of management by the proof in practice. The management system mentioned in this paper is applied to the design management in metro construction, and can increase the design management efficiency effective.
骆汉宾,宫培松,胡其虎,徐海清. 地铁设计管理系统的研究与应用[J]. 铁道工程学报, 2013, 30(9): 84-91.
LUO Han-bin, GONG Pei-song, HU Qi-hu, XU Hai-qing. A Study and Application on Management System of Metro Design. 铁道工程学报, 2013, 30(9): 84-91.
Pan Lima. The Study of Building Lifecycle Management Based the Construction Project Management Informatization [D]. Xian: Chang an University,2008.
[6] T. Froese, J. Rankin, K. Yu. Project Management Application Models and Computer-assisted Construction Planning in Total Project Systems[J]. International Journal of Construction Information Technology, 1997(1):39-62.
Zheng Yuanting, Ma Fengning, Chen Xiangyu. A study on Informatization in Chinese Construction Industry[J]. Industry Technological Economy, 2003(2):20-21.
[8] Nash Dawood, Abi Alcinsola, Brian Hobbs. Development of Automated Communication of System for Managing Site Information Using Internet Technology[J]. Automation in Construction, 2002(5):557-572.
The Informatization Leading Group of the Ministry of Construction. The Tenth Five-year Plan of Construction Informatization [R]. Beijing: The Informatization Leading Group of the Ministry of Construction, 2003.
[10]冯惠军.计算机集成施工[J].施工企业管理, 1996(12):41-42.
Feng Huijun. Computer Integrated Consruction[J]. Construction Enterprise Management, 1996(12):41-42.
Le Yun, Chen Weihua. Project Management Information System and Project Information Portal[J]. Project Management, 2003(5):56-63.
[12]Kenji Kimoto, Kazuyoshi Endo. Satoru Iwashita, Mitsuhiro Fujiwara. The Application of PDA as Mobile Computing System on Construction Management[J]. Automation in Construction, 2005(14): 500-511.
[13]Makarand Hastak, Daniel W. Halpin, Jorge Vanegas. Compass-new Paradigm for Project Cost Control Strategy and Planning[J]. Journal of Construction Engineering and Management, 1996(3):254-264.
[14]丁士昭.建设工程信息化导论[M].北京:中国建筑工业出版社,2005.
Ding Shizhao. Construction Engineering Informatization Introductory Theory[M]. Beijing: China Architecture & Building Press, 2005.