Abstract:Research purposes:To ensure high-speed train running safety,the control requirement of settlement after construction of the ballastless subgrade is very strict. The abnormal deformation is found in a station of a passenger dedicated line,and the maximum horizontal displacement is nearly 80 mm which is much higher than the norm allowable value and seriously affects the safe operation of high-speed trains. So the reasonable measures must be taken to renovate the horizontal section subgrade deformation exception paragraph.
Research conclusions:The treatment technique of abnormal deformation is very success. The conclusions are as follows: (1)It is feasible to control the lateral deformation of subgrade with high pressure jet grouting pile. The lateral thrust generated by the construction can be carried out slowly and effectively.(2)The monitoring system,which contains leveling,track monitoring car, deep soil layer displacement monitoring and pore water pressure monitoring,has been adopted to ensure the construction safety.(3)The early warning and forecasting procedure and management system are established,which ensure the implementation of the remediation technique.(4)This research provides a useful reference for the disease treatment of high-speed railway subgrade deformation.
温希华. 某客专路基变形病害整治技术研究[J]. 铁道工程学报, 2015, 32(8): 45-49.
WEN Xi-hua. Research on the Remediation Technology on Subgrade Deformation Disease of a Passenger Dedicated Line. 铁道工程学报, 2015, 32(8): 45-49.
TB 10621-2009,Code for Design of High Speed Railway[S].
Zhou Haibin, Li Zhihua. Research on Comprehensive Geophysical Exploration for Hidden Danger to Subgrade of Passenger Dedicated Line[J].Journal of Railway Engineering Society , 2013 ( 4 ):46-50.
Luo, Z.,Ku, C. S.,Bu, L. Probabilistic Model for Long-Term Deformation of Subgrade Bed Soil in Upgrading-Speed Railway Lines[J].International Journal of Pavement Research and Technology, 2011 (1):34-40.
Chen Dengyu, Li Tao, Zou Yan. Construction Technology on Base Deformation Remediation of Wuhan-Guangzhou High-speed Railway[J].Railway Construction Technology , 2013 ( 7 ):91-94,106.
Yao Yuchun, Wei Yongxing, Yuan Biyu. Exploration on the Deformation and Control of Embankment Constructed on Slope Foundation for High-speed Railway [ J].Journal of Railway Engineering Society, 2014(5):16-21.
JGJ 79-2012 , Technical Code for Ground Treatment of Buildings[S].
Qi Qinghai. Treating Techniques for The Diseases and Damages of The Seating of the Plate-Type CRTS B Ballastless Track in the Alignment Joint-Test Phase [J].Traffic Engineering and Technology for National Defence , 2013 ( 4 ):41-43.
Gong Quanmei, Luo Zhe, Yuan Jianyi. Experimental Study on Long-term Cumulative Settlement and Equivalent Cyclic Load of Speed-up Railway Subgrade Soil[J].Journal of the China Railway Society, 2009 (2):88-93.
[ 5 ]
JGJ 79-2012,建筑地基处理技术规范[S]
Li Guohe, Xu Zailiang, Sun Shuli, etc. The Influence of Surface Subsidence on Construction of High-speed Railway in North China Plain and Its Countermeasures [J].Journal of Railway Engineering Society , 2007 ( 8 ): 7-12.
Dong Juhong, Zhao Zhigang. Analysis of the Strengthening Design and for Fill Embankment Disease of High-speed Railway[J].Journal of Railway Science and Engineering , 2013 ( 4):66-73.