Abstract:On the basis of relationship among the minimal extending length, small radius and the length of back beam, the difficulty of bridge erection is solved by turning track and offset in advance.
舒文超,吴毓辛,金其寿. 小半径曲线地段喂梁作业的难点及解决方法[J]. 铁道工程学报, 2003, 20(3): 40-43.
SHU Wen-chao, WU Yu-xing, JING Qi-shou. THE DIFFICULTY AND SOLUTION OF BRIDGE ERECTION IN SMALL RADIUS CURVE ZONE. 铁道工程学报, 2003, 20(3): 40-43.