Abstract:Based on the specialties of different-type stations on double-tracked railway line and the construction practices on reconstruction of station and yard, the construction scheme for reconstructing station and yard by stopping the up train operation and the down train operation respectively has been proposed, which is convenient for construction, having high efficiency and may guarantee quality more easy. It is a model with valuable reference for reconstruction of station and yard on double-tracked railway lines.
杨世武. 宝成铁路增建二线站场改造施工方案[J]. 铁道工程学报, 2001, 18(4): 24-26.
YANG Shi-wu. RECONSTRUCTION OF STATION AND YARD DURING CONSTRUCTING No.2 LINE FOR BAO-CHENG RAILWAY. Journal of Railway Engineering Society, 2001, 18(4): 24-26.