Abstract:Research purposes:Through summarizing and drawing lessons from useful experience of the suburban railways of Tokyo,Paris and other typical world cities,the article explores 10 problems in planning and construction of suburban railways in some Chinese cities and put forward proposals to solve the problems.
Research conclusions:(1)Serious lag of suburban railways planning and construction in some Chinese cities is one cause of delay of city layout adjustment and optimization and one reason of traffic jams exacerbated.The construction thought of first inner city railways then outside the city should be reversed.(2)In some cities,partial sections of suburban railways are replaced as urban subways which has led amount of suburban railway too little,and single subway too long with longer travailing time and high investment.The whole rail network will tend to be low operational efficiency and poor investment efficiency.(3)Suburban railways should as far as possible pass through or into the downtown.and interchange with ring railway or subway stations located in the downtown.(4)Cherish the existing railway corridor resources in urban areas.(5)Finance in plural investment mode for construction of suburban railway.(6)Set up moderate technical standards and save investment of construction and operation.(7)Research and formulate uniform technical standards early.(8)111e network of city railway should be approved by the national department.(9)Cultivate professional team for design,advisory and construction management.(10)Offer reasonable working hours for suburban railway design,construction and commissioning.
秦永平. 我国市郊铁路规划和建设中的主要问题与建议[J]. 铁道工程学报, 2014, 31(3): 6-13.
QIN Yong-ping. Main Problems and Proposals for Suburban Railway Planning and Construction in Some Chinese Cities. Journal of Railway Engineering Society, 2014, 31(3): 6-13.
Shu Hmqm,Shi Xiaofa.The Effect of Tokyo Metropolis Circle勺Railway System to Urban Spatial Structure Development[J]. Urban Planning International,2008(3):105-109.