Abstract:The paper describes briefly the mode of quality management of engineering projects according to four stages since the founding of our People s Republic. The preceding stage was named as “ construction supervision peiiod”, and the existing problems in that period are analyzed. The present stage is named as “ synthetic control peiiocT,in which a supervision and guarantee system for construction quality will be put into effect-The contents of this system will include the self-control of the enterprise, social supervision, national control and user s evaluation. In present stage,the problems which should be taken into attention, as well as the specific division of labour for different departments,are also expounded in detail.
李本深. 铁道工程质量控制的模式[J]. 铁道工程学报, 2000, 17(4): 123-126.
LI Ben-shen. THE MODE OF QUALITY CONTROL FOR RAILWAY ENGINEERING PROJECTS. Journal of Railway Engineering Society, 2000, 17(4): 123-126.