Abstract:Based on the operating conditions of Qinhuangdao-Shenyang Special Railway Line for Passenger Transport,two kinds of dynamical model including high speed train, ballastless tracks and bridge are established,With that,the dynamical performances of locomotive,vehicles,ballastless track and railway bridge are studied when a high-speed train at a speed of 200 km/h,250 km/h,300 km /h respectively is passing through a ballastless track laid on a bridge.
蔡成标,翟婉明,王其昌. 高速列车与高架桥上无碴轨道相互作用研究[J]. 铁道工程学报, 2000, 17(3): 29-32.
CAI Cheng-biao,ZHAI Wan-ming,WANG Qi-chang. RESEARCH ON VERTICAL INTERACTIONS BETWEEN HIGH-SPEED TRAIN AND BALLASTLESS TRACK ON BRIDGE. Journal of Railway Engineering Society, 2000, 17(3): 29-32.
[1]铁道部科学研究院铁道建筑研究所.高速铁路无碴轨道结构设计参数的研究[R].北京:1996-12.
[2]翟婉明.车辆-轨道耦合动力学[M ].北京:中国铁道出版社,1997. Zhai Wan-ming. Tw o simple fast integration methods for large-scale dynamic problems in engineering [ J ]? In t ern at io n al Jo u rn al fo r N um eri cal M eth od s in Engineering,1996,39(24): 4799~ 4214.
[3]翟婉明.非线性结构动力分析的Newmark预测校正积分模式[J].计算结构力学及其应用,1990,7(2): 51~ 58.
[4]佐佐木直树著王其昌译.板式轨道[M ].北京:中国铁道出版社,1983.
[5]西头常彦.口>夕”-卜又亍7式直结轨道构造解析设计关研究[R].铁道技术研究报告. No 1047,1977-08.
[6]曹志远.板壳振动理论[M].北京:中国铁道出版社,1989.