Abstract:Problems concerned w ith the construction orga nization and the mecha ni zatio n o f equipment s fo r the Qinling ex tra-lo ng tunnel are int roduced. The paper expounds mainly the technical o rg ani za tion measure fo r rapid tunnelling , i ts procedures and ex periences, and the ex cellent ef fect obtained in recent y ears.
苟 彪,张松柏,李际中 . 秦岭Ⅱ 线隧道大断面平导 独头快速掘进技术[J]. 铁道工程学报, 1997, 14(2): 65-80.
Gou Biao Zhang So ng bai. SINGLE-END RAPID TUNNELLING TECHNIQUE AT EXIT OF LARGE CROSS-SECTION PARALLEL DRIFTON NO.Ⅱ LINE OF QINLING TUNNEL. Journal of Railway Engineering Society, 1997, 14(2): 65-80.