Abstract:Research purposes:With the rapid development of transportation in our country,a large number of long- span continuous rigid frame bridges with high piers are constructed. Because of high piers and large span,the nonlinear stability problem in the type of bridge construction process is very prominent. This thesis relies on a typical continuous rigid frame bridge with single thin-wall rectangular hollow piers-Wangjiaba Bridge construction monitoring project, studies the single nonlinear stability of the continuous rigid frame bridge with single thin-wall rectangular hollow piers, analyzes the stability eigenvalue of the bridge under each construction stage and nonlinear limit load value.
Research conclusions:(1)Load of eigenvalue buckling analysis is obtained for upper limit of bridge structure stable limit load.(2)Considering the geometric nonlinearity,material nonlinearity and the initial defects nonlinear stability analysis of the influence of the factors such as load,more in line with the actual situation.(3)The highest pier maximum cantilever construction condition is the most adverse conditions of the high pier construction.(4)The paper can provide the reference for construction monitoring,design and theoretical research of long-span continuous rigid frame bridge with high piers.
张运波,刘大鹏. 单薄壁空心矩形墩连续刚构桥非线性稳定研究[J]. 铁道工程学报, 2014, 31(1): 64-68.
ZHANG Yun-bo LIU Da-peng. Study on Nonlinear Stability of Continuous Rigid Frame Bridge with Single Thin-wall Rectangular Hollow Piers. 铁道工程学报, 2014, 31(1): 64-68.
Zheng Baocai , Cheng Wenbin , Hu Guowei. Analysis and Monitoring of Ground Subsidence Caused by Excavation of Adjacent and Crossing Metro Tunnel with Shallow- depth and Subsurface Excavation Method[J].Journal of Railway Engineering Society , 2009 (11) : 72-76.
Ren Jianxi,Wang Jinhua , Zhang Yinhe , etc. Study on Prediction of Surface Deformation during Shield Construction of Subway in Loess Stratum[J].Journal of Railway Engineering Society , 2011(11):93-97.
Luo Hanbin, Li Weiming, Zhou Guanghui. Analysis of Ground Settlement Caused by Shield Construction of Wuhan Metro with Non-equal Interval Model[J]. Journal of Railway Engineering Society ,2011(1):86-91.
Li Guocheng,Ding Lieyun. Ground Settlement Induced by Shield Construction of Wuhan Yangtze River Tunnel [J].Journal of Railway Engineering Society , 2008 ( 5): 59-62.
[7]王金华.西安地铁隧道盾构施工地表变形规律与控制技术研究[D].西安:西安科技大学,2011.
Wang Jinhua. Study on the Laws of Surface Deformation Caused by Shield Construction and Control Technology of Xi'an Subway Tunnel[D].Xi' an : Xi' an University of Science and Technology , 2011.
Song Weidong, Chen Ruihong, etc. Numerical Analysis of Earth Pressure Balance Shield Tunneling at Guomao—Shuangjing Interzone of Beijing Subway Line No. 10[J].Chinese Journal of Rock Mechanics and Engineering , 2008 ( S2 ) : 3041-3047.
[9]柳厚祥.地铁隧道盾构施工诱发地层移动机理分析与控制研究[D].西安:西安理工大学,2008.
Liu Houxiang. The Mechanism Analysis and Control of Ground Movements Induced by Subway Shield Tunneling Construction [ D ].Xi' an : Xi' an University of Technology,2008.