Abstract:Research purposes:With the Chongqing - Guiyang,Chengdu - Kunming,Changsha - Kunming and Guiyang - Kaiyang railway lines accessing into the Guiyang hub as well as the northwest and northwest loop lines of the Guiyang hub open to traffic,the general pattern of the Guiyang hub has to be adjusted. The Guiyang East Station is the station where the railway lines accessing into. How to choose the station type of the Guiyang East Station is crucial to the planning design of the Guiyang East Station in order to give the full play to the station function,optimize the route of passenger train and save the construction cost as much as possible. This paper intends to determine the reasonable and economic station type of the Guiyang East Station through comparing various station types.
Research conclusions:From the research on the schemes of the station types of the Guiyang East Station,it is concluded the layout of distributed yards should be adopted when several lines accessing into,the layout of the yards for the different lines should be adopted when there is a little exchange trains among the lines and the layout of the yards for the different directions should be adopted when there are many exchange trains among the lines. The method for selection of the general station type presented in this paper can provide the reference to the similar works.
韩长生,姚传开. 贵阳东站站型方案研究[J]. 铁道工程学报, 2013, 30(6): 73-77.
HAN Chang-heng,YAO Chuan-kai. Study on Scheme for Selection of Station Type of Guiyang East Station. 铁道工程学报, 2013, 30(6): 73-77.
GB 50091-2006,Code for Design of Railway Station and Terminal [S].
[3]铁建设[2007]47号,新建时速300?350公里客运专线 铁路设计暂行规定[S].
Railway Construction [ 2007 ] No. 47,The Temporary Regulations for the Designs of the Passenger Dedicated Railway with a Speed of 300 km/h to 350 km/h [S]
[4] 何华武. 无碴轨道技术[M]. 北京: 中国铁道出版社,2005.
He Huawu. Technology of Ballastless Track [M].Beijing: China Railway Publishing House,2005.
The Fourth Survey and Design Institute of China Railways. Railway Engineering Technical Manual -Station and Yard and Terminal[K]. Beijing: China Railway Publishing House,2004.
Li Jie. Study on the Plane Layout of Hezhou Railway Station of Guizhou - Guangzhou Rapid - speed Railway[J]. Journal of Railway Engineering Society,2010( 2) :89 - 92.
China Railway Eryuan Engineering Group Co. Ltd.Preliminary Design for Baiyun - Longlibei Contact line of Newly - built Gui Yang hub Railway[R]. Chengdu:China Railway Eryuan Engineering Group Co. Ltd,2010.
China Railway Eryuan Engineering Group Co. Ltd.Feasibility study for the contact line of Xiaobi by Qingzhendong to Baiyun Station of Newly - built GuiYang hub Railway[R]. Chengdu: China Railway Eryuan Engineering Group Co.Ltd,2010.