Abstract:Research purposes:Because of the characteristic including complex topography and geology,high proportion of bridge and tunnel,more high risk working points,difficult management of altered design,meanwhile,because of using more innovative technology in the construction process,the supervision of mountainous high speed railway has the particularity of technology and organization management.Combined with the main problems of current supervision,the paper analysed and thought how to implement the management target including safety,quality,investment,construction period,environment protection,stability in the construction of mountainous high speed railway.
Research conclusions:(1)Safety risk control is an important content of supervision work.(2)The supervision company must take part in the practical process of technological innovation actively.(3)Key posts such as the chief supervision engineer and group leader of a section,must have rich experience,and the supervision company must hold regular training for the supervising engineers.(4)The matrix supervision organization is more suited to supervision of the mountainous high speed railway.(5)The domestic installation and work facilities of supervisors must accord with building a clean environment and the feature of mountain area.(6)Control the quMity of transition section strictly. (7)Strengthen the information construction,control the supervising condition and personnel position of every worksite strictly.(8)strengthen the environment supervision,control the sensitive worksites emphatically.(9)Adaptation to local conditions and innovation management is important guarantee to complete the supervision of mountainous high speed railway.
王明慧,李新强,李东斌,张桥. 山区高速铁路监理工作分析与思考[J]. 铁道工程学报, 2013, 30(12): 99-103.
WANG Ming-hui,LI Xin-qiang,LI Dong-bin,ZHANG Qiao. Analysis and Thinking about Supervision of Mountainous High Speed Railway. 铁道工程学报, 2013, 30(12): 99-103.
Wang Hechuan.The Application of Matrix Supervision Organization in the Construction Stage of Big Bid Section Passenger Railway[J].Railway Standard Design,2010(1):16-18.
[2] 袁晓辉.铁路监理企业项目综合管理系统的研究与实现 [D].成都:西南交通大学,2007.
Yuan Xiaohui.The Research and Realization of Comprehensive Management Information System of Railway Project Management[D].Chengdu:Southwest Jiaotong University,2007.
[3] 王在磊.基于物联网的铁路建设监理管理信息系统研究 [D].北京:北京交通大学,2011.
Wang Zailei. Railway Construction Supervision Management Information System Based on Interuet of Things[D].Beijmg:Beiiing Jiaotong University,2011.
Wang Yuanpeng.Discussion on the United-supervision Mode Applied in the Large Bidding Section of Railway Construction[J].Journal of Railway Engineering Society,2008(10):96-99.
Wang Minghni,Zhang Qiao.Analysis on Selection of High Embankment and Viaduct Bridge in Express Railway Engineering in Mountain Area[J].Subgrade Engineering,2012(4):55-57.