Journal of Railway Engineering Society  1995, Vol. 12 Issue (4): 70-79    DOI:
Current Issue | Archive | Adv Search |
RESEARCH ON FEASIBILITY OF DESIGNNING CABLE — STAYED BRIDGE WITH PC CONTINUOUS RIGID -STRUCTURE IN QUASI-HIGH-SPEED RAILWAY
Pei Ruojuan
Civil Engineering Dept. ? Central China Science and Engineering University,Wuhan
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech