Home
About Us
Science Information
Article
Subscribe
Contact
Editorial
Message
中文
The mobile platform
Journal of Railway Engineering Society
1997
,
Vol. 14
Issue (3)
: 34-43
DOI
:
Current Issue
|
Archive
|
Adv Search
|
DESIGN TECHNOLOGY OF LONG SPAN TELPHER FOR LARGE BRIDGE ON QING SHUI RIVER
Gou Baofei Meng Xienzhong Bu Qingbao
Sixteenth Engineering Bureau of MOR
Abstract
Figure/Table
References (0)
Related Citation (15)
Download:
PDF
(495 KB)
HTML
(1 KB)
Export:
BibTeX
|
EndNote
(RIS)
Abstract
The article mainly introduces the methods of design and removing the long span telpher with long distance and huge highness located on complex and difficult relief.
Key words
:
design
long span telpher
Received:
18 April 1997
Service
E-mail this article
Add to my bookshelf
Add to citation manager
E-mail Alert
RSS
Articles by authors
Cite this article:
URL:
http://tdgcxb.crec.cn/EN/
OR
http://tdgcxb.crec.cn/EN/Y1997/V14/I3/34
[1]
WANG Zheng - ming.
Research on the Integrated Alignment of Geothermal District of Lhasa - Rikaze Railway
[J]. Journal of Railway Engineering Society, 2015, 32(9): 1-5.
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:
Beijing Magtech