Journal of Railway Engineering Society  1998, Vol. 15 Issue (3): 60-66    DOI:
Current Issue | Archive | Adv Search |
PRACTICE ON CONSTRUCTION VENTILATION IN ENTRANCE SECTION OF PARALLEL HEADING AT NO. Ⅱ LINE OF QINLING TUNNEL
LIU Kainian
Fi rst Rai lw ay Engineering Burea u of MOR
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech