|
|
REINFORCING GROUND CREEP AT ENTRANCE OF TUNNEL BY PRESTRESSED ANCHOR CABLE |
FENG Ming-jun1,JU Xiao-hua2 |
1. Eleventh Engineering Bureau of MOR,Suizhou,Hubei 441300; 2. China Railroad Construction General Corporation,Beijing 100855 |
|
|
Abstract The paper introduces the engineering practice for treatment of ground creep at the entrance of the Mingyuexia Tunnel in Bao-Cheng double track railway by the application of prestressed anchor cables. The design,construction and application characteristics of the prestressed anchor cable are explored.
|
Received: 20 July 1998
|
|
|
|
|
|
|
|