Journal of Railway Engineering Society  1999, Vol. 16 Issue (4): 42-46    DOI:
Current Issue | Archive | Adv Search |
CONSTRUCTION TECHNIQUE THAT BRING PRESTRESSED EQUIVALENT PRESSURE TO BEAR ON NO. 0 BLOCK CANTILEVER BRACKET OF CONSTRUCTED BRIDGE
WANG Zhao-hui
Fourteenth Engineering Bureau of MOR
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech