|
|
REGULATION OF CONSTRUCTION TUNNEL DISASTER FOR XIN-XIN-WU-CHANG |
LI Wei-ping |
Fourth Survey and Design Institute of MOR |
|
|
Abstract The paper describes the regulation treatment for a bigger collapse disaster occurred in construction of the Xirnin谓 u~chang Tunnel on the Zhuzhou-Liupanshui double track line of the Xiang -Qian Railway. The adopted measures are the auxiliary construction measures, including the pre-grouting of open cut tunnel entrance and ground surface, the pre-grouting of extra-leading short pipe-shed inside of the tunnel, self-advanced type grouting anchor bolts, etc.
|
Received: 15 January 2000
|
|
|
|
|
|
|
|