FEASIBLE PROBINGON NEW METHOD OF DISPLACEMENT MONITOR OF TUNNEL |
XU Wan-peng |
The 15th Engineering Bureau of MOR |
|
|
Abstract In this paper, according to the trait of displacement monitor of N ATM and combined with the develop of modern instrument of measure,two new methods of diplacement monitor of tunnel are put forward “ the system of three—iimensional displacement monitor” and “ the arbitrary point system of peripheral convergence of tunnel”. The former, at one point, can provide the dependable informations of three— dimensional deformation for several sections of inspect in a short time. The latter, can provide the accurate informations of peripheral convergence of tunnel for several sections of inspect,and its working efficency can be improved distinctly than the conventional method.
|