|
|
SUPERVISION OF CONSTRUCTION QUALITY ON HIGHWAY'S MAIN BRIDGE FOR NORTH BRANCH OF NANJING SECOND YANGTZE RIVER |
ZHANG Wen-xian, WANG Yuan-peng |
Xin Yatai Engineering Supervision Department (Co.), Third Survey and Design Institute of MOR |
|
|
Abstract In the constructing process of continuous concrete beams which are the parts of the north bridge of Nanjing Second Yangtze River Bridge, we take the ways of measuring by sight, surveying and testing. In the process of quality controlling, we took the measures of Ten Rigidities, Ten Tests, Ten Standards, warranting the eligibility rate up to 100 percent.
|
Received: 14 January 2001
|
|
|
|
|
|
|
|