Journal of Railway Engineering Society  2002, Vol. 19 Issue (2): 58-60    DOI:
Current Issue | Archive | Adv Search |
PRELIMINARY DISCUSSION ON ALLOCATION OF CONSTRUCTION MA- CHINERY DURING CONSTRUCTING SUBWAY'S SECTION BY USING MIN- ING METHOD
FANG Jun-bo1、2,GUO Lei2
1 Northern Jiaotong University; 2 Scientific Research Institute of China Railway Tunnel Engineering Group Co.
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech