Abstract Karat is a geological phenomenon that is usually encountered in tunnel construction. It could lead to water spraying and mud flowing from excavation face and deformation, cracking and collapse of ground and lining. Therefore, it will affect the construction speed,jeopardize the safety of construction and spoil the environment. 1n this paper, the principle of treatment for the karat is presented and the methods of dealing with the karat are discussed for different type of karst. Moreover, the construction practice is introduced.
|
Received: 15 August 2002
|
|
|
|
|
[1]吴治生,付伯森.南岭隧道岩溶注浆概况及经验教训[J]. 铁道工程学报.1989.(2):168-176.
[2]舒伟.王石春.大瑶山隧道岩溶突水与地面塌陷问题[J]. 铁道工程学报.1989. (2) :145-151.
[3]铁道部第二勘测设计院.铁路工程设计技术手册:隧道 [M].中国铁道出版社.1999 , 426-427.
[4]蒋忠信.秦小林.南昆铁路隧道溶洞的预测与检验[J].铁道工程学报,1 997 , (1) : 95-103.
[5]张延.陈中.隧道岩溶处理面面谈[J].现代隧道技术, 2001,38(1):60-64.
[6]余波.深埋隧道中的岩溶地基工程地质问题及地基处理 [J ].岩土力学与工程学报,2001,20(3):403-407.
|
|
|
|