SELECTION AND PURCHASE OF CONSTRUCTION KEY MACHINERY QUIPMEN TS FOR BRIDGE ERECTION AN D TRACK LAYING ON QIN-SHEN DEDICATED RAPID PASSENGER TRAFFIC RAILWAY LINE |
XUE Lin |
Dept. of Industry M achinery Equipments, China Railway Engineering General Corporation |
|
|
Abstract Based on the technical standards and the construction organizations of the Qin-Shen dedicated rapid passenger traffic railway line, the overall processes concerned with the complete setting, selection, purchase and application of the construction machinery equipments for bridge erection and track laying of Qin-Shen railway line are summarized in this paper. The practices show that the complete setting and selection process of construction machinery for Qin-Shen railway linewas very scientific, and the complete setting of machinery was advanced and with high efficiency. It provides experience on complete setting of construction machinery for large- scale engineering project in the future.
|
Received: 18 August 2002
|
|
|
|
|
Cite this article: |
XUE Lin. SELECTION AND PURCHASE OF CONSTRUCTION KEY MACHINERY QUIPMEN TS FOR BRIDGE ERECTION AN D TRACK LAYING ON QIN-SHEN DEDICATED RAPID PASSENGER TRAFFIC RAILWAY LINE[J]. Journal of Railway Engineering Society, 2002, 19(4): 91-95.
|
|
|
|
URL: |
http://tdgcxb.crec.cn/EN/ OR http://tdgcxb.crec.cn/EN/Y2002/V19/I4/91 |
[1]中国铁路工程总公司.秦沈线铺架施工安排[R].
[2]时速200 km新建铁路线、桥、隧、站设计暂行规定[S].铁建管[1998]279号.
[3]韩国KUEDO KONGYUNG公司施工韩国汉城至Dae- jun高速铁路资料[Z].
|
|
|
|