|
|
EXAMINATION AND STADY ON FROZEN SOIL OF QING-ZANG RAILWAY BY EXPLOSION CRATER |
ZHANG Jun-bing1, ZHANG Zhi-yi2, FU Hong-xian2 |
1China Railway Third Engineering Bureau Group Co; 2China Academy of Railway sciences |
|
|
Abstract Now, Qing-Zang railway is being built, much frozen soil is needed to be blasted, but the literatures about frozen soil blasting in home and abroad is few. The paper describes a few explosion craters carried out in certain place of Qing-Zang railway, the optimum depth and maximum volume are obtained, and the optimum blasting parameters are also found out.
|
Received: 11 January 2003
|
|
|
|
|
[1]冯叔瑜,马乃耀.爆破工程[M].北京:中国铁道出版社,1980.18,23. |
|
|
|