APPLICATION RESEARCH OF THE SHEAR WALL RECTIFY A DEVIATION IN HIGH BUILDING BY USING SPRAYED CONCRETE |
ZHANG Zhong-xian1, ZHANG Jie1,CHEN Yi-pin2, LI Shao-jin3 |
1. Huazhong University of Science and Technology,Wuhan;2.Zhongnan Architectural Design Institute,Wuhan;3. Wuhan Company of Hubei Telecommunication |
|
|
Abstract In this article, authors are based on the engineering structure, Treated the deviation of the shear wall axial line and sectional dimension in the reinforced concrete high rise walled frame structure,and these deviations are appeared many place in the shear wall from 5th floor to 9th floor,The strengthening treatment method with adopt drilling & bond re?inforcement bar and sprayed concrete has a lot of evident goodness in the shear wall rectify a deviation and strenthening. After analyze these goodness, Search sprayed concrete construction technique and give some advises on sprayed concrete construction execution of work.
|
Received: 11 March 2004
|
|
|
|
|
[7] |
王广军.震损建筑修复加固设计与施工[M].北京:地震出版 社,1994.
|
[6] |
王赫.建筑工程亊故处理手册[M].北京:中国建筑工业出版 社,1995.
|
[1] |
许兰.质量事故分析[M].北京:中国环境科学出版社,1998.
|
[2] |
范锡盛,王跃.建筑工程事故分析及处理实例应用手册[M]. 北京:中国建筑工业出版社,1995.
|
[3] |
CECS25-90.混凝土结构加固技术规范[S].北京:中国计 划出版社,1992.
|
[4] |
李安勇.混凝土结构加固工艺的现状和未来[J].苏州城建 环保学院学报,2000,13(4) : 16-18.
|
[5] |
张熙光,王俊孙,刘惠珊.建筑抗震鉴定加固手册[M].北京: 中国建筑工业出版社,2001.
|
[8] |
JGJ3-2002.高层建筑混凝土结构技术规程[S].
|
[9] |
GBJ86-85[S].锚杆喷射混凝土技术规范,北京:中国建筑 工业出版社,1985.
|
|
|
|