铁道工程学报  2004, Vol. 21 Issue (4): 68-76    DOI:
Current Issue | Archive | Adv Search |
CONSTRUCTION TECHNIQUE FOR MAIN CAVE OF No.2 KARST CAVE OF YUANLIANGSHAN TUNNEL
ZHANG Min-qing1, SUN Guo-qing2,ZOU Chong1, PENG Feng2, XU Qian2
1.Yichang-Wanxian Railway Line Engineering Headquarter of engineering Management Centre of Ministry of Railways; 2. Scientific and Technical Research Institute of China Railway Tunnel Engineering Bureau Group Co.
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech