RESEARCH ON GROUTING MATERIALS FOR FILLING KARST CAVE WITH HIGH-PRESSURE HYDRODYNAMIC SILT LAYER |
ZENG Wei 1, ZHANG Min-qing2 |
1 Xi'an Employee' College of Railway Engineering; 2 Scientific and Technical Research Institute of Chinese Railway Tunnel Group Corporation |
|
|
Abstract Research purpose: Karst Cave 2 of Yuanliangshan Tunnel is a filling karst cave with high-pressure hydrodynamic silt layer. No such kind of cave has been found in all constructions of tunnel at home and abroad, so there is no successful experience to learn. The research is made on grouting materials for such kind of cave by application of many theories and doing lots of practices in this paper in order to solve the problem of grouting engineering.
Research method: Ordinary concrete-water glass two-shot grouting and extra fine concrete-water glass two-shot grouting are adopted in construction of the pilot tunnel under karst cave 2. By this way, it is difficult to pass through one cave. Following it, after the level pilot tunnel encounters karst cave, two-shot grouting is adopted, but the result is not good. To such situation, the grouting materials are adjusted and ordinary concrete one-shot grouting and extra fine concrete one-shot grouting are introduced to form group grouting materials. The group grouting materials increase the grouting effects for level pilot tunnel. But after it rains on earth surface, the grouting solidification is broden down by high-pressure water and cause failure of grouting. Through summing up the experiences and learning lessons, TGRM grouting and HSC grouting are introduced to form a complete set of system and selected model with six kinds of grouting materials.
Research result: The grouting problem of level pilot tunnel and main cave of filling karst cave 2 with high-pressure hydrodynamic silt layer is solved by the complete set of system with six kinds of grouting materials.
Research conclusion: With national technique, the reinforcement of filling karst cave with high -pressure hydrodynamic silt layer can be well done and engineering for it can be kept going smoothly by adopting the complete set of system with six kinds of grouting materials of ordinary concrete one-shot grouting, extra fine one-shot grouting, ordinary concrete-water glass two-shot grouting, extra fine concrete-water glass two-shot grouting, TGRM grouting and HSC grouting.
|
Received: 18 August 2005
|
|
|
|
|
[1]铁道部第二勘测设计院.渝怀线圆梁山隧道补充设计地质 说明[R].北京,2001.8.
[2]张民庆,彭峰.圆梁山隧道毛坝向斜水压力监测分析[J].岩土 工程学报,2003, 25(6): 702-705.
[3]渝怀线圆梁山隧道设计方案论证会[R].北京,2000.
[4]渝怀线圆梁山隧道高水位富水段工程技术方案论证会[R].北 京,2001.
[5]张民庆,韩忠存,施宏峰.超细水泥-水玻璃双液浆的研究及 应用[J].铁道工程学报,1998, (4):132-141.
[6]张民庆,韩占波,孙国庆等.高压动水砂层溶洞地质注浆加 固施工技术[J].铁道建筑技术,2003, (2):11-14.
[7]渝怀线铁路圆梁山隧道施工技术方案论证会[R].重庆,2003.
[8]张民庆,孙国庆,邹冲等.圆梁山隧道2#溶洞正洞施工技术 [J].铁道工程学报,2004 , (4):68-76.
|
|
|
|