APPLICATION OF INFORMATIONAL CONSTRUCTION TECHNOLOGY IN DEEPLY FOUNDATION PIT EXCAVATION |
WANG Lian-shan1, JIAO Cang2, XI Zheng-ping1 |
1Tunnel Engineering Group Stock Co. Ltd of China Railway; 2China Railway Tunnel Group Co., Ltd |
|
|
Abstract Research purposes: Deeply foundation pit is affected by some factors and is the key problem of geotechnical engineering at present. In the course of the construction of foundation pit, the deformation of supporting structures must be surveyed and controlled strictly according to the engineering geological condition, style of the supporting and safety level of the building.
Research methods: Monitoring survey technique was applied in the monitoring of wall and supporting of the YingKouDao station construction in phase 1 project the deformation of the supporting structure and the development of the surrounding was mastered. This paper introduces about the significance, content of urban deep pit deformation survey, the layout of survey spots, data survey, etc. By executing the survey of deep pit deformation, the paper recommends relying on the dynamic information feedback of deformation survey to ensure the construction safety and optimal design of deep pit. Subsequently, corresponding technologic measures of how to control deformation in pit were proposed and fully applied to the construction in phase 1 project. Good effects were achieved in guiding Tianjin Metro construction at the same time some valuable conclusions were obtained.
Research Conclusions: In the processing of deeply foundation pit, we need monitor and control strictly the deformation of supporting structure according to scene actual engineering geologic condition, the types of supporting choice and the safe degree of buildings. Deeply foundation pit of metro is designed and constructed by information way. It is convenient to strengthen the survey and feedback the information, amend and modulate the construction scheme to make the construction in the controlled condition. In the processing of deeply lunation pit, we must strengthen survey; exactly analyze the survey result in time to ensure the safe coefficient of supporting system. And we can evaluate the former design scheme and put reward tile countermeasures to ensure the construction safety in the base of exact analysis.
|
Received: 05 November 2005
|
|
|
|
|
[1] |
刘建航,侯学渊.基坑工程手册[M].北京:中国建筑工业出版社,1997.
|
[2] |
陈肇元,崔京浩.深基坑支护技术综述[R].广州:广州地铁总公司,1997.
|
[3] |
JGJI20-99,建筑基坑支护技术规范[S].
|
[5] |
汤永净,谢乐才,柳玉进.软土地区高层建筑逆作法施工理论分析与实测比较[J].上海铁道大学学报,1999,20(4):95-100.
|
[4] |
Goodman R E, Tayor R L, Brekke T L. A model for the mechanics of jointed rock[J]. J. Soil Mech. Found. Div., ASCE, 1968, 94(3):637-659.
|
|
|
|