Research methods: Through studying of two reforming examples of existing routines regarding Erweilu Station of Tianjin Underground Routine One and Tobacco Factory Station of Period One of Haerbin Underground Routine One, this paper further researches and discusses problems in existing routines one by one.
Research conclusions: From the above two different examples of reforming of existing station, we can reform and utilize existed routines based on the guide principle of “utilizing section, reforming stations". Due to the comparatively easy disposal in section tunnel, it is easy to reform. As stations serve passengers directly, in which equipment are gathered together, it is difficult to reform. Rebuilding stations not only can improve underground service quality but also can solve the technical insufficiency of existing station completely.