|
|
Primarily Evaluate the Main Design Factors on the System of Chongqing-Huaihua Railway Line |
WANG Jian |
The Second Survey and Design Institute of China Railway, Chengdu, Sichuan 610031, China |
|
|
Abstract Research purposes: The main design factors on the system of railway line project could forecast the goals planned by the owner of the project. It is very essential to review for main design factors on the system of railway line project. This paper tries to discuss the way about the primary review for main design factors on the system of railway line project and make out the primary review for main design factors on the system of Chongqing-Huaihua railway line.
Research methods: Railway project is considered complicated system in this paper. There are many ways on the primary review for main design factors on the system of railway line project. This paper studies the review way of design factors on the system of railway line project planned.
Research results: It is indicated that the design factors on the system of Chongqing-Huaihua railway line project are approving according to the conditions given by the Primary Review.
Research conclusions: It is one of the ways to forecast the goals planned by the owner of the project and has a foreground on development.
|
Received: 16 June 2006
|
|
|
|
|
[2] |
王毅,等.渝怀铁路技术设计总说明书[Z].成都:铁道部第二勘测设计院,2000.
|
[3] |
王科,等.渝怀线技术总结[R].成都:铁道部第二勘测设计院,2003.
|
[4] |
王毅.渝怀铁路总体设计[J].北京:铁道标准设计,2003年(增刊):28-30.
|
[5] |
渝怀铁路初验委员会.新建重庆至怀化铁路初验报告[R].北京:铁道部建设司,2005.
|
[1] |
金观涛,等.控制论与科学方法论[M].北京:新星出版社,2005.
|
|
|
|