Experimental Research on Settlement during Construction of Large-diameter Advanced Tubal Curtain |
MA Suo-zhu |
China Railway Tunnel Group Co., Ltd., Luoyang, Henan 471009, China |
|
|
Abstract Research purposes: Chongwenmen Station of Line 5 of Beijing Metro will underneath pass the existing operating Metro, but there is strict requirement for settlement to operate Metro. The experimental research was made on settlement during construction of large-diameter advanced tubal curtain so as to build Chongwenmen Station safely and smoothly.
Research methods: The experiment was done in order to make research on settlement changes caused by construction. In experiment, the same matter as that in construction scheme for tubal curtain and the similar stratum of geological condition were used. The tubal curtain was jacked in by level by diauxic dry screw drilling machine with level guidance by long support. The unit of tube shed with diameter of 600 mm was adopted for tubal curtain with I steel occlusion. The theoretical calculation was made before the experiment for making comparison with that after experiment.
Research results: The support measures in advance were proposed in construction scheme for large-diameter advanced tubal curtain in order to control the displacement of stratum. The experiment was done smoothly and found out the influence on slum by construction of tubal curtain, and the expected goal was achieved basically.
Research conclusions: The experiment proves the influence on slum by construction of large-diameter tubal curtain is small, the real tested data are close to the result of theoretical calculation and the support measures in advance for large-diameter tubal curtain can be used in real construction.
|
Received: 17 February 2006
|
|
|
|
|
[2] |
方从启,王承德.顶管施工中的地面沉降及其估算[J].江苏理工大学学报,1998,19(4):106-110.
|
[3] |
朱忠隆,张庆贺.盾构法施工对土体影响理论与试验研究[J].岩石力学与工程学报, 1999,18(增):1087-1091.
|
[4] |
沈杰.地基基础手册[M].上海:上海科学技术出版社,1985.
|
[1] |
乔宏伟,邓志辉.顶管施工中的地面沉降的预测[J].岩土钻凿工程,2001,18(5):29-32.
|
[6] |
陈金水.漳龙高速公路龙门隧道的设计与施工[J].岩土力学,2001,22(2):237-240.
|
[5] |
杨晓杰,邓飞皇,曹伍富,等.广州地铁双线交汇段放坡支护方案优化研究[J].中国矿业大学学报,2004,33(3):268-272.
|
|
|
|