铁道工程学报  2006, Vol. 23 Issue (6): 92-94    DOI:
Current Issue | Archive | Adv Search |
Analysis of the Inequality between the Employer and the Contractor under “Conditions of Contract for Construction" of FIDIC
YIN Jiang-tao1, ZHANG Xian-jin2
1.Wuhan Architectural Design Institute, Wuhan, Hubei 430014, China; 2.Huazhong University of Science and Technology, Wuhan, Hebei 430074, China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech