|
|
Comparison Research on the Scheme of Localing the Cross-zone Handover in Tunnel |
LI Dong 1, DING Guo-Peng 2, ZHAO Ming2,GAO Da-Gang 1 |
1. Beijing Electrification Railway Telecommunication &Signal Survey Design Institute, Beijing 100036,China; 2. Tsinghua University, Beijing 100084, China |
|
|
Abstract Research purposes: Many problems about handover exist in the passenger dedicated railway and subway mobile communication. The research was made on the scheme of totaling the cross-zone handover. It was proposed for the purpose of providing basis and reference to the wireless communication planning and opitimizing for railway and subway mobile communication. Research methods: In accordance with the analysis of different schemes on totaling the cross-zone handover and in combination with the technology development of railway mobile communication system, the comparison and research were made for some programs from the economy and feasibility and dependability for urban transit. Research results: Several schemes on totaling the cross-zone handover were presented and comparied. Research conclusions: In the working of locating the cross-zone handover, not only the speed and the time of handover would be considered, but also the fast fading and the mechanism of handover would be considered.
|
Received: 07 September 2007
|
|
|
|
|
[1]李如纬.GSM-R系统越区切换实现方案的研究[J].移 动通信,2005(5):93-97.
[2]黄吉莹,马君,钟章队.客运专线中GSM-R越区切换的 研究[J].铁道通信信号,2006,42(5):51-53.
[3]钟章队,李旭,蒋文怡,等.铁路综合数字移动通信系统 [M].北京:中国铁道出版社,2003:159-172.
[4]韩斌杰GSM原理及其网络优化[M],北京:机械工业 出版社,2004.
|
|
|
|