Construction Technology for High Risky Qiyueshan Tunnel |
ZHANG Qing-xin, WANG Xiao-yan |
The Yichang-Wanzhou Railway Project Headquarter, China Railway 15th Group Co. Ltd., Lichuan Hubei 445415, China |
|
|
Abstract Research purposes: Qiyueshan Tunnel is one of 8 grade one high risky tunnels on Yichang-Wanzhau Railway with complicated unfavorable geological conditions and high constructional risk. How to prevent and avoid high constructional risk and how to eliminate the unfavorable geological disaster are the key factors of ensuring construction security and quality.
Research conclusions: For prevention of and avoiding high constructional risk in construction of high risky tunnel, the geological risky grade should be classified, the geological forecast in advance, measurement and control of wall rock and measures for alarm of prevention of disaster should be conducted well, more attention should be paid to the construction organization in unfavorable geological zone and the suitable construction program and measures should be adopted and taken, including reinforcement, excavation, support and lining of the wall rock in advance.
|
Received: 26 January 2008
|
|
|
|
|
[1]TB 10204-2002/J 163-2002,铁路隧道施工规范[S].
[2]铁道第四勘测设计院.宜万铁路复杂隧道施工地质实施细则[Z].
[3]铁道第四勘测设计院.宜万铁路复杂岩溶隧道施工防灾报警系统施工图[R].武汉:铁道第四勘察设计院,2007.
|
|
|
|