铁道工程学报  2008, Vol. 25 Issue (5): 14-19    DOI:
Current Issue | Archive | Adv Search |
Discussion on the Treatment of Geological disaster of Fragmentary Flows (Slack) for Lenglongling Tunnel
CHAI Hai-lou
The Third Engineering Company, China Railway 7th Engineering Group Co. Ltd.,Xianyang, Shanxi 712000, China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech