铁道工程学报  2008, Vol. 25 Issue (9): 100-103    DOI:
Current Issue | Archive | Adv Search |
The Effect of Construction Project Risk Management in the General Control Mode
QI Xiao-ming
China Railway Electrification Survey Design and Research Institute, Tianjin 300250,China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech