铁道工程学报  2008, Vol. 25 Issue (9): 66-70    DOI:
Current Issue | Archive | Adv Search |
Construction Technology of the High Pressure and Enriched Water Fault F1 in Bieyancao Tunnel on Yichang-Wanzhou Railway
WANG Shu-guo1,ZHANG Min-qing1,HUANG Hong-jian1,CHEN Wei-yuan2 , YIN Huai-lian3
1. Yichang-Wanzhou Railway Construction Headquater, Ministry of Railways, Enshi, Hubei 445000,China; 2. Yichang-Wanzhou Railway Construction Headquater, China Railway 21st Bureau Group Co. Ltd, Wanzhou, Chongqing 404100,China; 3. China Railway Siyuan Survey and Design Group Co. Ltd, Hubei, Wuhan 430063, China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech