铁道工程学报  2009, Vol. 26 Issue (3): 43-47    DOI:
Current Issue | Archive | Adv Search |
Discussion on the Key Technologies for Construction of Karst Tunnel
LU Shao-wei1, HE Jian2
1. The Xiamen-Shenzhen Railway Headquarter of China Railway Tunnel Group Co. Ltd, Puning, Guangdong, 515325, China; 2. The Guiyang-Guangzhou Railway Headquarter of China Railway Tunnel Group Co. Ltd, Duyun, Guizhou, 558000, China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech