铁道工程学报  2010, Vol. 27 Issue (4): 49-52    DOI:
Current Issue | Archive | Adv Search |
Use Nonlinear Programming to Achieve Camber of Steel Truss Continuous Bridge
HU Bu-mao, Ai Zong-liang, Yuan Ming, Dai Sheng-yong
China Railway Eryuan Engineering Group Co. Ltd, Chengdu, Sichuan 610031, China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech