China Railway First Survey and Design Institute Group Ltd. Feasibility Study on the Extended Second Line of the Renovated Railway of Baoji - Zhongwei Line Part 4 Geology[R]. Xi’an: China Railway First Survey and Design Institute Group Ltd,2011.
[2] 铁道部第一勘测设计院. 新建铁路宝鸡中卫线初步设计第四篇 地质[R]. 兰州: 铁道部第一勘测设计院,1986.
Ministry of Railway the First Survey and Design Institute. Preliminary Study on the Renovated Railway of Baoji - Zhongwei Line Part 4 Geology [R]. Lanzhou: Ministry of Railway the First Survey and Design Institute,1986.
[3] TB 10012—2007,铁路工程地质勘察规范[S].
TB 10012—2007,Code for Geology Investigation of Railway Engineering[S].
[4] GBJ 50111—2006,铁路工程抗震设计规范 [S].
GBJ 50111—2006,Code for Seismic Design of Railway Engineering[S].
[5] 中国地震局地壳应力所. 宝中铁路增建二线新六盘山隧道水压致裂法地应力测试初步结果[R]. 北京: 中国地震局地壳应力所,2011.
China Seismological Bureau Crust Stress Institute. New Liupan Mountain Tunnel Preliminary Ground Stress Test Results of Extended Second Line of Baoji - Zhongwei Railway [R]. Beijing: China Seismological Bureau Crust Stress Institute,2011.
[6] 王联平. 西南线芦山隧道地质选线[J]. 铁道工程学报, 2001( 3) : 96 - 99.
Wang Lianping Geologic Route Selection for Lushan Tunnel of Xi’an - NangJing Railway[J]. Journal of Railway Engineering Society,2001( 3) : 96 - 99.