Huang Tielan. The Confirmation of Route Scheme of Shanghai - Kunming Passenger Dedicated Railway Leading into Changsha Pivot Based on Fuzzy Analytic Hierarchy Process[J]. Journal of Railway Engineering Society,2010( 2) : 1 - 3.
[6] 李冰. 客运专线引入铁路枢纽的方案评价[J]. 铁道运输与经济,2007( 3) : 32 -33.
Li Bing. Evaluation on the Plans of Introducing Passenger Dedicated Line into Railway Terminal[J]. Railway Transport and Economy,2007( 3) : 32 - 33.
[7] 王刚. 浅析衡茶吉铁路速度目标值的选择[J]. 黑龙江科技信息,2009( 9) : 406 -407.
Wang Gang. The Research on Speed Choice of Hengyang - Chaling - Jian Railway[J]. Heilongjiang Science and Technology Information,2009( 9) : 32 - 33.
[8] 龚增进. 新建 200 km/h 客货共线铁路线路设计参数研究[J]. 铁道建筑,2007( 6) : 8 -9.
Gong Zengjin. The Design Parameters of the Passenger and Freight Railway with a Speed of 200 km /h[J]. Railway Engineering,2007( 6) : 8 - 9.
[9] 张元. 怀化至邵阳至衡阳铁路速度目标值的选择[J].铁道标准设计,2010( 3) : 6 -7.
Zhang Yuan. The Research on Speed Choice of Huaihua - Shaoyang - Hengyang[J]. Railway Standard Design, 2010( 3) : 6 - 7.