Jiang Ying,Cao Zheming,Liu Tie. Application of High Frequency Magentotelluric Method to the Karst Exploration the Tunnel along Yi - Wan Railroad[J]. Chinse Journal of Engineering Geophysics,2006( 3) : 208 -210.
[4] 邓谊明. 宜万线一个值得注意的岩溶地质问题———P1m 地层中的古岩溶[J]. 地质与路基,2004( 3) : 1 -4.
Deng Yiming. A Notable Karst Geological Problems -The Ancient Karst of P 1m of Yichang - Wanzhou Railway[J]. Railway Geology & Subgrade,2004( 3) : 1 -4.
[5] 徐红星,邓谊明. 野三关隧道 DK 124 + 602 突水相关水文地质分析[J]. 铁道工程学报,2010( 4) : 29 -34.
Xu Hongxing,Deng Yiming. Analysis of Hydrogeology Problems Related to Water Bursting in Area of DK 124 + 602 at Yesanguan Tunnel of Yichang - wanzhou Railway [J]. Journal of Railway Engineering Society,2010( 4) : 29 - 34.
[6] 曾宪明. 宜万铁路施工地质工作[J]. 铁道勘察,2010 ( 1) : 34 -39.
Zeng Xianming. Discussion on Engineering Geological Work at Construction Phase of Yichang - Wanzhou Railway[J]. Railway Investigation and Surveying,2001 ( 1) : 34 -39.
[7] 邓谊明. 枝( 城) 万( 州) 线选线中的主要工程地质问题研究[J]. 中国地质大学学报,2001( 4) : 23 -28.
Deng Yiming. Main Engineering Geological Problems in option of Zhicheng - Wanzhou Railway [J]. Social Sciences Edition Journal of China University of Geosciences,2001( 4) : 23 - 28.
[8] 曹哲明. 超前地质预报在隧道施工中的应用[J]. 铁道勘察,2007( 3) : 57 -58.
Cao Zheming. Application of Lead Geological Prediction in Construction of Tunnels [J]. Railway Investigation and Surveying,2007( 3) : 57 - 58.