Huang Wentao, Wang Zhuomin, Liu yongkang. Methods and Applications of Overhead Transmission Line Fault Location[J]. Guangdong Electric Power, 2005( 1) : 23 - 25.
[2] JGJ 46—2005,施工现场临时用电安全技术规范[S].
JGJ 46—2005,Construction Site Temporary Electrical Safety Specifications[S].
[3] DL/T 741—2010,架空输电线路运行规程[S].
DL /T 741—2010, Overhead Transmission Lines Running Order[S].
[4] 国家电网公司. 电业安全工作规定( 线路部分) 第一版[M]. 北京: 中国电力工业出版社,2009.
State Grid Corporation . Electrical Safety Requirements ( Line Section) First Edition[M]. Beijing: China Electric Power Industry Press,2009.
[5] 冯怀. 500 kV 高压线下架桥机过孔的安全防护措施[J].百度文库,2010( 18) : 1 -5.
Hong Huai. Security Measures for the Bridge Machine Through the Hole under 500 kV High - voltage Lines [J]. Baidu Library,2010( 1) : 1 -5.