Zhang Zhiqiang,He Chuan,She Caigao.Three Dimensional Finite Element Modeling of Excavation and Advancement Processes of Shield Tunnel Construction in Nanjing Metro[J].Journal of the China Railway Society,2005(1) : 84-89.
[11]张海波,殷宗泽,朱俊高,等.盾构法隧道衬砌施工阶段受力特性的三维有限元模拟[J].岩土力学,2005(6) : 990-994.
Zhang Haibo,Yin Zongze,Zhu Junguo,etc.Three Dimensional FEM simulation of Shield - driven Tunnel Lining During Construction Stage [J].Rock and Mechanics,2005(6) : 990-994.
[12]宋克志,袁大军,王梦恕.盾构法隧道施工阶段管片的力学分析[J].岩土力学,2008(3) :619-623.
Song Kezhi,Yuan Dajun,Wang Mengshu. Segmental Mechanical Analysis of Shield Tunnel During Construction Stage [J].Rock and Mechanics,2008 (3) :619-623.
[13] 石立成,杜守继,张强. 盾构通缝拼装隧道纵向错台的数值模拟分析[J].石家庄铁道学院学报( 自然科学版) , 2007( 3) : 37-40.
Shi Licheng,Du Shouji,Zhang Qiang.Numerical Simulation Analysis on Longitudinal Dislocation for Shield Tunnel with Straight Joint [J].Journal of Shijiazhuang Railway Institute (Natural Science) ,2007 (3) :37-40.
[14]孙文昊,焦齐柱,兰宇. 盾构管片接头抗弯刚度影响因素研究[J].铁道工程学报,2008(3) :66-71.
Sun Wenhao,Jiao Qizhu,Lan Yu.Research on the Factors Influencing Flexural Rigidity of Duct Piece Joint of Shield Tunnel[J].Journal of Railway Engineering Society,2008(3) : 66-71.