|
|
Measures for Lightning Protection for OCS of High - speed Railway and Proposals |
SHAO Li,WANG Guo - liang,BAI Yi - feng |
The Third Survey and Design Institute Group Corporation,Tianjin 300251,China |
|
|
Abstract Research purposes:At present,the high - speed railways in China cross the different geographical zones,but there is no backup system for them. Therefore,once the permanent damage caused by lightning strike happens,the power supply will fail to work. According to the regulations,the independent lightning conductor is set up only for the overhead contact line system ( OCS) in strong lighting area. But the OCS of high - speed railway in China is often built in heavy lighting area without lightning conductor,so it is easily stroke by lightning. To guarantee the high reliability of OCS of the high - speed railway in China,it is proposed the measures for lightning protection should be taken for OCS of the high - speed railway. Based on the theoretical calculation and analysis,the study is done on the measures for lightning protection for OCS of the high - speed railway.
Research conclusions: Considering that the lightning strike to the high - speed railway happens frequently and based on the calculation and analysis of the flashover of the OCS caused by lightning,it is proposed that PW ( protection wire) should be arranged on the top of the pole and the positive feeder should be installed with compound insulator in Auto -Transformer ( AT) power supply,and at the same time,the arrester and PW should be grounded to ensure the normal work of the lightning protection devices. It is also proposed that the indexes,such as the lightning withstand level of catenary and the switch - off rate or the failure rate,should be improved.
|
Received: 09 May 2012
|
|
|
|
|
[1]于万聚.接触网设计及检测原理[M].北京: 中国铁道出版社,1991.
Yu Wanju.Theory of Catenary Design and Inspection [M].Beijing: China Railway Publishing House,1991.
[2]于万聚.高速电气化铁路接触网[M].成都: 西南交通大学出版社,2002.
Yu Wanju.High Speed Electrified Railway Catenary [M].Chengdu: Southwest Jiaotong University Publishing House,2002.
[3]TB 10009—2005,铁路电力牵引供电设计规范[S].
TB 10009—2005,Design Code of Electric Traction Feeding[S].
[4]吉鹏霄. 接触网[M]. 北京: 化学工业出版社,2006.
Ji Pengxiao. Catenary[M].Beijing: Chemical Industry Press,2006.
[5]于增.接触网防雷技术研究[J].铁道工程学报,2002 (1) :89 -94.
Yu Zeng.Study on Lightning Protection of Catenary [J].Journal of Railway Engineering Society,2002(1) : 89-94.
[6]铁建设[2007]39 号,铁路防雷、电磁兼容及接地工程技术暂行规定[S].
China Railway Construction[2007] No.39,Interim Provisions for Techniques of Railway Lightning Protection, Electro - magnetic Compatibility and Ground Engineering[S].
[7]范海江,罗健.铁路客运专线接触网防雷研究[J]. 铁道工程学报,2008(8) :80-83.
Fan Haijiang,Luo Jian.Research on the Lightning Protection of OCS in Passenger Dedicated Lines[J]. Journal of Railway Engineering Society,2008( 8) : 80-83.
[8]TB 10621—2009,高速铁路设计规范[S].
TB 10621—2009, Code for Design of High Speed Railway[S].
[9]GB 50057—2010,建筑物防雷设计规范[S].
GB 50057—2010, Design Code for Protection of Structures Against Lightning[S].
[10]吴广宁,曹晓斌,李瑞芳. 轨道交通供电系统的防雷与接地[M]. 北京: 科学出版社,2011.
Wu Guangning,Cao Xiaofang,Li Ruifang. Lightning Protection and Grounding of Rail Transportation supply system[M]. Beijing: Science Press,2011.
|
|
|
|