The Third Railway Survey and Design Institute Group Corporation.Feasibility Study of Haerbin—Mudanjiang Passenger Dedicated line[R].Tianjin:The Third Railway Survey and Design Institute Group Corporation,2009.
[2] 谢智泓.沪昆铁路客运专线杭长段线路总体走向研究[J].铁道标准设计,2009(8):4—7.
Xie Zhihong.General Alignment of Hangzhou—Changsha Section on Shanghai—Kunming Railway Passenger Dedicated Line[J]. Railway Standard Design,2009(8):4—7.
[3] 王久玲. 京沪高速铁路引入徐州枢纽联络线设置的探讨[J].铁道勘察与设计,2004( 3) :33—35.
Wang Jiuling.Research on Connecting Track Schemes of Leading JingHu Dedicated Passenger Line into Xuzhou Terminal[J].Railway Survey and Design,2004(3) :33—35.
[4] 左武,赵升. 郑徐客运专线引入徐州枢纽方案研究[J].铁道工程学报,2010( 12) :5—8.
Zuo Wu,Zhao Sheng. Research on Schemes of Leading Zhengzhou- Xuzhou Passenger Dedicated Line into Xuzhou Terminal[J].Journal of Railway Engineering Society,2010(12) : 5—8.
[5] GB 50090—2006,铁路线路设计规范[S].
GB 50090—2006,Code for Design of Railway Line[S].
[6] TB 10621—2009,高速铁路设计规范( 试行) [S].
TB 10621—2009,Code for Design of High Speed Railway[S].
[7] GB 50091—2006,铁路车站及枢纽设计规范[S].
GB 50091—2006,Code for Design of Railway Station and Terminal[S].
[8] 铁道第四勘察设计院. 站场及枢纽(修订版) [M].北京:中国铁道出版社,2004.
China Railway Siyuan Survey and Design Group Co.Ltd.Railway Station and Terminal[M].Beijing: China Railway Publishing House,2004.
[9] 王彦. 武九客车联络线引入九江站方案探讨[J].铁道标准设计,2009(11) :7—10.
Wang Yan. Research on Schemes of Leading Wu Jiu Passenger Dedicated Line into Xuzhou Terminal[J].Railway Standard Design,2009(11) : 7—10.