|
|
Study on Optimization of Excavation and Support Parameters for Deep -buried Super - large Span Single - arch Tunnel |
KANG Fu - zhong1,HE Shao - hui2,ZHANG Qi3,CAO Rui - lang2 |
1. CABR,Beijing 100013,China; 2. Beijing Jiaotong University,Beijing 100044,China; 3. China Railway Sixth Group Co. Ltd,Beijing 100036,China |
|
|
Abstract Research purposes: The Badaling Four - line - way Tunnel of the new Beijing - Zhangjiakou Railway is the first tunnel with so large span in China,featured with the span of 27. 3 m,the height of 18 m and the cross section area of 386. 56 m2 . For excavation,the following four excavation methods were planned: the single - wall pilot method,the single rock column method,the CRD four - hole method and the six - hole CRD method. The finite element software was used to make the simulation calculation of the excavation and support processes with the four methods mentioned above for the purpose of getting the optimal construction scheme.
Research conclusions: From the comparison of the seven parameters of the maximum drawing and compressive stresses,the vault settlement,the ground settlement,the axial force of the anchor arm and the maximum drawing and compressive force of the lining,it can be seen the single - wall pilot method is the optimal excavation method,followed by six - hole CRD method,based on taking the 0. 3 m thick spraying concrete lining and 5 m long anchor arm as the support paramters. The research result is reasonable and has the reference to the design and construction.
|
Received: 18 March 2012
|
|
|
|
|
[1] TB 10003—2005,铁路隧道设计规范[S].
TB 10003—2005,Code for Design on Tunnel of Railway[S].
[2] Sorensen Inc. ABAQUS/Standard User’s Manual[M].Hibbit,karisson; Sorensen Inc., 2002.
[3] 张学言. 岩土塑性力学[M]. 北京: 人民交通出版社,1993.
Zhang Xueyan. Geotechnical Plastic Mechanics[M].Beijing: China Communications Press, 1993.
[4] 谭忠盛,喻渝,王明年,等. 大断面浅埋黄土隧道锚杆作用效果的试验研究[J]. 岩土力学, 2008( 2) : 491 - 495.
Tan Zhongsheng, Yu Yu,Wang Mingnian, etc.Experimental Study on Bolt Efect on Large Section Shallow Depth Ioess Tunnels [J]. Rock and Soi1 Mechanics, 2008( 2) : 491 - 495.
[5] 姜德义,刘春,李光扬,等. 大跨度隧道围岩竖直压力计算值的对比分析[J]. 中国矿业, 2005( 11) : 63 - 66.
Jiang Deyi,Liu Chun,Li Guangyang,etc. Correlation and Analysis of Calculation Valucs of Vertical Pressure of Wall Vocks of Large - spat Tunnel[J]. China Mining Magazine, 2005( 11) : 63 - 66.
[6] 李利平,李术才,张庆松,等. 浅埋大跨隧道现场试验研究[J]. 岩石力学与工程学报, 2007( 增l) : 3565 - 3570.
Li Liping,LI Shucai,Zhang Qingsong,etc. In - situ Testing Study on Shallow - burid Large - span Tunnel [J ]. Chinese Journal of Rock Mechanics and Engineering, 2007( Supp1) : 3565 - 3570.
[7] 张国华,陈礼彪,夏祥,等. 大断面隧道爆破开挖围岩损伤范围试验研究及数值计算[J]. 岩石力学与工程学报,2009( 8) : 1610 - 1618.
Zhang Guohua,Chen Libiao,Xia Xiang, etc. Numerical Sim Ulatlon and Experim Ental Study of Damage Range of Surrounding Rock Inlarge Tunnel Under Blasting Excavation[J]. Chinese Journal of Rock Mechanics and Engineering, 2009( 8) : 1610 - 1618.
[8] 肖林萍,赵玉光,李永树. 单拱大跨隧道信息化施工监控量测技术研究[J]. 中国公路学报, 2005( 4) : 62 - 66.
Xiao Linping,Zhao Yuguang,Li Yongshu. Research on Field Monitor Measuring Techniques in Informational Construction of Single Arch Long - span Tunnel[J].China Journal of Highway and Transport,2005 ( 4 ) :62 - 66.
[9] 王秀芬,周书明,罗小平. 青岛仰口硬岩大断面隧道的设计和快速施工[J]. 铁道工程学报, 2009( 9) : 69 - 72.
Wang Xiufen,Zhou Shuming,Luo Xiaoping. Design and Rapid Construction of Tsingtao Yangkou Large Section Tunnel in Hard Rock [J]. Journal of Railway Engineering Society,2009( 9) : 69 - 72.
[10] 刘洪伟,李建华. 不同围岩条件下大跨隧道的施工方案探讨[J]. 地质与勘探, 2000( 5) : 91 - 94.
Liu Hongwei,Li Jianhua. Discussion on Executing Plan of Long Span Tunnel Under Different Country Rock Conditions[J]. Geology and Prospecting, 2000( 5) : 91 -94.
[11] 郑俊杰,刘秀敏,欧阳院平,等. 大断面隧道锚杆设置的优化分析[J]. 地下空间与工程学报, 2009( 2) : 341 - 346.
Zheng Junjie,Liu Xiumin,Ouyang Yuanping,etc.Optimum Analysis of Large - Section Tunnel’s Bolts Location by FLAC[J]. Chinese Journal of Underground Space and Engineering, 2009( 2) : 341 - 346.
[12] 胡国伟. 复杂条件下超大跨地铁车站施工仿真技术研究[J]. 铁道工程学报, 2007( 9) : 87 - 90.
Hu Guowei. Research on Emulation Technology for Construction of Super Long - span Metro Station Under Complex Conditions [ J ]. Journal of Railway Engineering Society, 2007( 9) : 87 - 90.
[13] 刘建平,罗琼,孙兆远,等. 客运专线超大断面隧道不同工法引起地表变形数值分析[J]. 铁道工程学报, 2006( 6) :55 - 58.
Liu Jianping,Luo Qiong,Sun Zhaoyuan, etc. Numerical Analysis of Surrounding Rock Deformation for Tunnel Excavation in Passenger Dedicated Railway Line[J].Journal of Railway Engineering Society,2006 ( 6) : 55 - 58.
[14] 刘春,易俊,姜德义,等. 大断面隧道施工力学响应数值模拟研究[J]. 中国矿业, 2008( 2) : 90 - 93.
Liu Chun,Yi Jun,Jiang Deyi,etc. The Numerical Simulation of Constructional Mechanical Responses of Highway Tunnel with Large Cross Section[J]. China Mining Magazine, 2008( 2) : 90 - 93.
[15] 张顶立,王梦恕,高军,等. 复杂围岩条件下大跨隧道修建技术研究[J]. 岩石力学与工程学报, 2003( 2) : 290 - 296.
Zhang Dingli, Wang Mengshu, Gao Jun, etc.Construction Technique of Large - span Tunnel Under Condition of Complicated Surrounding Rocks [J].Chinese Journal of Rock Mechanics and Engineering,2003( 2) : 290 - 296.
[16] 万明富,郝哲,刘剑平,等. 超大跨公路隧道开挖与支护稳定性分析[J]. 辽宁工程技术大学学报, 2007( 1) : 71 - 73.
Wan Mingfu,Hao Zhe,Liu Jianping,etc. Analysis of Stability about Excavation and Support of Super - span Road Tunnel [J]. Journal of Liaoning Technical University, 2007( 1) : 71 - 73.
[17] 刘彤,刘伟,刘新东. 高速公路特大断面隧道施工过程数值分析[J]. 四川建筑科学研究, 2007( 3) : 210 - 213.
Liu Tong,Liu Wei,Liu Xindong. Numerical Analysis of Construction Process for Four - lane Section Tunnel [J]. Sichuan Building Scienc, 2007( 3) : 210 - 213.
[18] 吴梦军,黄伦海,刘新荣. 特大断面隧道施工方法试验研究[J]. 重庆建筑大学学报, 2005( 5) : 57 - 60.
Wu Mengjun, Huang Lunhai, Liu Xinrong.Experimental Study on Construction Method of Super -large Section Tunnel[J]. Journal of Chongqing Jianzhu University, 2005( 5) : 57 - 60.
[19] 伍国军,陈卫忠,戴永浩,等. 浅埋大跨公路隧道施工过程和支护优化的研究[J]. 岩土工程学报, 2006( 9) : 1118 -1122.
Wu Guojun,Chen Weizhong,Dai Yonghao,etc. Study on Excavation Sequences and Support Optimization for Shallow - buried and Large - spanned Tunnels[J].Chinese Journal of Geotechnical Engineering, 2006( 9) : 1118 - 1122.
|
|
|
|