Comparative Study on Engineering Geology for Site Selection of Jinsha River Bridge on Lijiang-Shangri-la Railway |
ZHANG Guang-ze,JIANG Liang-wen, CHAI Chun-yang |
China Railway Eryuan Engineering Group Co. Ltd,Chengdu,Sichuan 610031,China |
|
|
Abstract Research purposes: It is important and essential to study the regional engineering geological characteristics of Jinsha River bridge for guiding site selection and the principle to select railway line when the main comparative bridge sites are determined. Then,the comprehensively comparative analyzing the engineering geological conditions determine the recommendations.
Research conclusions: Jinsha River Bridge site is determined in the Reshuitang-Hutiaoshi stretches of river. This paper key studies three bridge sites,including the bridge site No. 7,the bridge site No. 8,and the bridge site No. 27, then,based on the integrated exploration,some conclusions can be drawn as follows:(1)The bridge site No. 7 is failed because of the unstable ground,the low-intensity foundation and the instability slope.(2)The study shows that the bridge site No. 8 and No. 27 have good engineering geological conditions,but the former clashes with the dam site of LongPan Dam,thus adopts the latter.(3)This paper can be used as a reference for the siting of the bridge in alpine gorges.
|
Received: 21 March 2013
|
|
|
|
|
[1]中铁二院工程集团有限责任公司.新建铁路丽江至香格里拉线初步设计第四篇地质[R].成都:中铁二院工程集团有限责任公司,2012.
China Railway Eryuan Engineering Group Co. Ltd. The Four Part of the preliminary design of the New Lijiang-Shangri-la Railway-Geology [R]. Chengdu: China Railway Eryuan Engineering Group Co. Ltd, 2012.
[2]中铁二院工程集团有限责任公司.新建铁路丽江至香格里拉线初步设计金沙江大桥工程地质勘察报告[R].成都:中铁二院工程集团有限责任公司,2012.
China Railway Eryuan Engineering Group Co. Ltd. The Geological Survey Report of JinSha River Bridge on the preliminary design of the New Lijiang-Shangri- la Railway[R].Chengdu: China Railway Eryuan Engineering Group Co. Ltd, 2012.
[3]中国地震局地壳应力研究所.新建丽江至香格里拉铁路工程场区地震动参数区划报告[R].北京:中国地震局地壳应力研究所,2008.
Institute of Crustal Dynamics , China Seismological Bureau. Seismic Ground Motion Parameter Zonation Map of the New Lijiang-Shangri-la Railway[R]. Beijing: Institute of Crustal Dynamics, China Seismological Bureau, 2008.
[4]中国地质科学院地质力学研究所.滇藏铁路丽江一香格里拉段活动断裂调查鉴定报告[R].北京:中国地质科学院地质力学研究所,2006.
Institute of Geomechanics , Chinese Academy of Geological Sciences. The Investigation and Identification of Active Faults on the Section from Lijiang-Shangri of the Yunnan - Tibet Railway[R].Beijing: Institute of Geomechanics , Chinese Academy of Geological Sciences, 2006.
[5]李天斌,王兰生.岩质工程高边坡稳定性及其控制[M]. 北京:科学出版社,2008.
Li Tianbin, Wang Yusheng. The Stability of High Rock Engineering Slopes and its Control[M].Beijing: Science Press, 2008.
[6]TB 10012—2007,工程地质勘察规范[S].
TB 10012—2007,Engineering Geology Survey Specification [S ].
[7]朱颖.铁路选线理念的创新与实践[J].铁道工程地质学报,2009(6):1-5.
Zhu Ying. Innovation and Practice on Railway Location Concept [J].Journal of Railway Engineering Society, 2009(6):1-5.
|
|
|
|